Data communication

Routing data
IMPORTANT! Operating the inverter with one option card and two broken-out
communication
option card slots is not permitted.
cables
To cater for this eventuality, a suitable blanking cover (item number
42,0405,2094) is available from Fronius as an option.
IMPORTANT! If data communication cables are wired into the inverter, observe
the following points:
-
-
1
3
Installing the
Datamanager in
the inverter
Danger of residual voltage from capacitors.
This may result in an electric shock.
Depending on the number and cross-section of the data communication
cables that are being introduced, take the relevant blanking plugs out of the
sealing insert and insert the data communication cables.
The relevant blanking plugs must be inserted into the free openings on the
sealing insert.
WARNING!
Wait for the capacitors to discharge. The discharge time is five minutes.