Notice; Installation Precautions - Ispring WHOLE HOUSE WCS45KG Installation Instructions & User Manual

Central softener
Hide thumbs Also See for WHOLE HOUSE WCS45KG:
Table of Contents

Advertisement

Warning
This system can only be used with 120V/60Hz unidirectional AC power.
Do not place objects on top of the power cord, and set the unit in an area where the power cord
will not be stepped on or tripped over.
Electric shock hazard: Do not overload sockets or extension cords.
If there is smoke, abnormal odor, or abnormal noise coming from the machine, immediately
unplug the system's power to avoid fire or electric shock.
Do not touch the plug with wet hands to prevent electric shock.
(1) Location
This system is required to be installed indoors. The installation location should be well-
ventilated and protected against wind and rain. Avoid direct sunlight and radiation from any heat
sources. Water leakage protection is highly recommended to be installed together with the
system. If it needs to be installed outdoors, heat preservation measures must be taken for the
body and pipes, including frost-proof, sun-proof, and waterproofing measures and insulation.
The system's power supply and plug must be installed in a wall position higher than 500 mm
above the ground and equipped with proper grounding, leakage protection, and waterproof
devices.
The installation location should be level, and the ground-bearing capacity should be greater than
2
300 kg/m
.
Ensure that there is proper space around the system, and do not apply any external force to the
system or its connecting pipes.
Do not install this system near corrosive substances or gases, as this may cause the system to
corrode.
This system should be installed out of reach of children.
(2) Others
This equipment should never be tilted or placed horizontally during transportation, installation,
or use.
This sewage pipe should remain open at all times.
Do not place flammable items on or near the product.
The installation and commissioning of all machines can be conducted by yourself or a
professional technician.
◼ The overflow pipe and the sewage pipe must be connected to the sewer separately, and the two
must not be combined and then transferred to the sewer. The sewer drainage must be unobstructed,
and there must be an air gap between the sewage pipe and sewage to prevent the sewage from
flowing back into the system due to negative pressure.
◼ Before connecting the water inlet pipe, please remove any remaining impurities and dust in the pipe
and close the main water supply before connecting it.
◼ When connecting screw parts, seal rings are generally installed. Please be aware that excessive
force may cause the threads to slip and the screw to crack.
◼ Connect the hose to the brine suction port on the control valve, connect the other end to the brine
valve, tighten the nut, and ensure all connections are tight to prevent leakage.
Page 8

Installation Precautions

www.123filter.com

Notice

| +1 (678) 261 - 7611 |
support@123filter.com

Advertisement

Table of Contents
loading

Table of Contents