Installation - Sav 243.40 Operating Instructions Manual

Electro-magnetic chucks, rectangular
Table of Contents

Advertisement

Available languages

Available languages

WORKHOLDING AND AUTOMATION
e) workplace:
The place of the operator is at the control desk of the machine. Make sure all components
are mounted properly and the work piece is secure. According to accident prevention law
VBG 7n6, for setting-up, the machine start must be interrupted by a suitable circuit wiring
(potential free relays, look to operating instructions for electronic control-unit).
f) savety devices:
Always wear safety-glasses to protect your eyes from centrifuged cuttings as well as
safety-gloves and -shoes.

2. Installation

a) Technical Information:
SAV classification. number:
Max. temperature of work piece:
Max. temperature on site:
International protection:
duty cycle:
for special design 243.99:
magnetic chuck
pole pitch P
wearability of pole
plate:
nominal holding
force:
chuck voltage
Max.
current
section of cable
14
BAL 243.40 / .41 / .42 / .99
OPERATING INSTRUCTIONS
For Electro Magnetic Chucks Rectangular
SAV 243.40
transverse pole pitch
4 mm
8 mm
100 N/cm²
24V up to dim. 400x200
110V over dim. 400x200
6A
3 x 1,5 mm
243.40 / 243.41 / 243.42
80° C
176° F
45° C
113° F
IP 65
100% ED
see enclosure
SAV 243.41
longitudinal pole pitch
4 mm
8 mm
100 N/cm²
24V up to dim. 400x200
110V over dim. 400x200
4A up to dim. 400x150
6A up over dim. 400x150
3 x 1,5 mm
2
V 2.0
SAV 243.42
transverse pole pitch
13 / 18 / 25 mm
8 mm
90 N/cm² at P=13
110 N/cm² at P=18
115 N/cm² at P=25
24V up to dim. 800x200
110V over dim. 800x200
4A up to dim. 600x200
6A up to dim. 2000x600
15A over dim. 2000x600
3 x 1,5 mm
up to dim. 2000x600
2
3 x 2,5 mm
over dim. 2000x600
2
2

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

243.41243.42243.99

Table of Contents