Commercial Boilers; Burner Equipment - Riello RLS 68/E MX Installation, Use And Maintenance Instructions

Dual fuel light oil / gas burners
Table of Contents

Advertisement

4.9

Commercial boilers

The burner is suitable for operating on both flame inversion boil-
ers (*), as well as on boilers with a combustion chamber with run-
off from the bottom (three flue passes) on which the best results
for low NO
emissions are obtained.
x
The boiler front door maximum thickness must not exceed 200
mm (Fig. 4).
The coupling is ensured when the boiler is EC type-approved; for
boilers or ovens with combustion chambers of very different di-
mensions compared to those shown in the diagram of Fig. 3 pre-
liminary checks are recommended.
(*) For flame inversion boilers, a kit is available to reduce the CO,
if necessary.
4.10

Burner equipment

Flange for gas train . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . No. 1
Slide bar extensions (TC version) . . . . . . . . . . . . . . . . . . . No. 2
Slide bar extensions (TL version) . . . . . . . . . . . . . . . . . . . . No. 4
Gasket for flange . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . No. 1
M10x35 screws to fix the gas flange . . . . . . . . . . . . . . . . . No. 4
Thermal insulation screen . . . . . . . . . . . . . . . . . . . . . . . . . No. 1
Screws M12x35 to fix the burner flange to the boiler . . . . . No. 4
Flexible hoses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . No. 2
Fitting for flexible hoses . . . . . . . . . . . . . . . . . . . . . . . . . . . No. 2
Gaskets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . No. 2
Spare parts list . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . No. 1
Instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . No. 1
Technical description of the burner
11
GB
200 mm MAX
D1079
Fig. 4
20121288

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rls 120/e mx779t1780t1

Table of Contents