UPS2000-H-(6 kVA-10 kVA)
Quick Guide
Figure 1-45 Cable routes for four parallel UPSs (tower-mounted)
(1) AC input power cable
1.3.3.2 Installing AC Power Cables
Context
● In a parallel system, connect loads to the AC OUTPUT PL terminal, instead of
● When the PG connection box is configured, see
Procedure
Step 1 Switch off the upstream AC circuit breaker for the UPS.
Step 2 Remove the covers from the UPS wiring ports.
Step 3 Install AC output power cables and then AC input power cables in sequence.
Issue 03 (2023-08-20)
NO TICE
the SL terminal (no output voltage).
Cables (with a PG Connection
Copyright © Huawei Digital Power Technologies Co., Ltd.
1 Installation and Cable Connection
(2) AC output power cable
1.2.3.3 Installing AC Power
Box).
31