UPS2000-H-(6 kVA-10 kVA)
Quick Guide
●
Step 6 Install the top cover from the connection box.
Figure 1-25 Installing the top cover from the connection box
Step 7 Move the top cover of the PG box to the assembly position and tighten the PG
connector.
Issue 03 (2023-08-20)
Figure 1-23 Installing AC power cables
(1) Short-circuit copper bar
Three-phase input single-phase output
Figure 1-24 Installing AC power cables
Copyright © Huawei Digital Power Technologies Co., Ltd.
1 Installation and Cable Connection
20