Huawei UPS2000-H Quick Manual page 25

Hide thumbs Also See for UPS2000-H:
Table of Contents

Advertisement

UPS2000-H-(6 kVA-10 kVA)
Quick Guide
Figure 1-20 Removing the top cover from the connection box
Step 3 Install the lower shell of the PG box.
Figure 1-21 Installing the lower shell of the PG box
Step 4 Route the cable through the gland.
Figure 1-22 Routing the cable through the gland
Step 5 Install AC output power cables and then AC input power cables in sequence.
Issue 03 (2023-08-20)
Single-phase input single-phase output
a.
Take out a short-circuit copper bar from the fitting bag and short-circuit
L1, L2, and L3 using the short-circuit copper bar.
b.
Secure the AC power cables to the wiring ports.
Copyright © Huawei Digital Power Technologies Co., Ltd.
1 Installation and Cable Connection
19

Advertisement

Table of Contents
loading

Table of Contents