Power Unit Priming Procedure - IDEAL MSC-6KLP Installation & Operation Manual

Mobile single column lift
Table of Contents

Advertisement

POWER UNIT PRIMING PROCEDURE

THE PROBLEM: Power unit runs fine but will not pump any fluid.
Step 1 – Locate the check valve. It is the plug to the left of the lowering valve.
Step 2 – Using a Hex wrench and shop towel – with shop towel in place to catch fluid – loosen
the check valve plug by approximately 2-½ turns and allow fluid to bleed off.
Step 3 – Push the START button for one second, then release for three seconds. Repeat these
steps until unit starts pumping fluid.
Step 4 – Tighten the check valve plug.
YOUR POWER UNIT SHOULD NOW BE PRIMED, READY TO GO.
17
MSC-6KLP
Sep 2022

Advertisement

Table of Contents
loading

Table of Contents