Bulkhead Installation - Dometic Optimus EPS Installation And User Manual

Electronic power steering with electric actuator
Table of Contents

Advertisement

Nominal
Length
Part No.
12'
CM30012
18'
CM30018
12'
CM31012
18'
CM31018
Table 5-2.
IGN+
Figure 5-7. Nominal harness lengths.
5-8
Style
Battery
Straight
12 (3.6)
Straight
12 (3.6)
180°
12 (3.6)
180°
12 (3.6)
CAN3
CAN2
IGNITION
5.3.2

Bulkhead installation

The Electric Actuator harness is supplied with a bulkhead plate and cord
grip pre-installed. The harness ships with a protective cover on the
connector at the actuator end.
NOTICE!
Leave the protective cover on the harness connector until you are ready to
connect it to the actuator, otherwise the connector may be damaged.
1. Determine where you want the harness to enter the transom. Pre-drill a
1.5" hole through the transom, above the waterline, for each actuator.
A template is provided in Appendix A.
CAUTION!
Do not install the bulkhead plate below the waterline. The fitting is not
completely watertight.
Harness component length, ft (m)
Ignition
CAN1
30 (9.1)
12 (3.6)
30 (9.1)
18 (5.5)
30 (9.1)
12 (3.6)
30 (9.1)
18 (5.5)
BATTERY
CAN3
CAN2
CAN1
CAN2
CAN3
12 (3.6)
12 (3.6)
18 (5.5)
18 (5.5)
12 (3.6)
12 (3.6)
18 (5.5)
18 (5.5)
EN

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ea1400Ea1000Ea1300

Table of Contents