① (Optional) To reduce the weight of the enclosure, disconnect the power adapter cables from the nodes
and remove the nodes.
② Disconnect all the cables that are connected to the enclosure, and slide the enclosure out until it stops.
③ Press the release latches to disengage the inner rails.
④ Remove the enclosure.

Install the rail kit and SR250

A A b b o o u u t t t t h h i i s s t t a a s s k k
See the following table to identify the components that come with the rail kit.
1
Document
2
Left rail
3
Right rail
The cabinet supports up to four units of SR250 and corresponding rail kit. For optimal use of space, it is
advised to determine the location to install the rail kits based on the number of units that are installed.
• One unit: 3U
• Two units: 3U and 4U
• Three units: 3U, 4U, and 5U
• Four units: 3U, 4U, 5U, and 6U
Note: When installed vertically into this cabinet, the server can be installed with server top facing either right
or left. In this section, however, it is illustrated with the top of server facing left as an example.
P P r r o o c c e e d d u u r r e e
Step 1.
Remove the inner rails.
26
ThinkSystem Micro DataCenter 6U 800mm Deep Rack Cabinet User Guide
4
Two M6 screws
5
Four black M3.5 x 5 mm flat head screws with pre-
applied threadlocking adhesive

Advertisement

Table of Contents
loading

This manual is also suitable for:

Thinksystem micro datacenter 6u7d2p

Table of Contents