Mechanical Installation; Important Precautions During Installation - HBM C9C Mounting Instructions

Hide thumbs Also See for C9C:
Table of Contents

Advertisement

Available languages

Available languages

Mechanical installation

6
Mechanical installation
16
6.1
Important precautions during
installation
S Handle the transducer with care
S Comply with the requirements for the force application
parts, as specified in section 6.2.
S Welding currents must not be allowed to flow over the
transducer. If there is a risk that this might happen,
you must provide a suitable low-ohm connection to
electrically bypass the transducer. HBM offers the
highly flexible EEK ground cable in various lengths for
this purpose, which can be screwed on above and
below the transducer.
S Make sure that the transducer is not overloaded.
WARNING
There is a danger of the transducer breaking if it is
overloaded. This can cause danger for the operating
personnel of the system in which the transducer is
installed, as well as for people in the vicinity.
Implement appropriate safety measures to avoid
overloads (also see the Specifications section 9, on
page 26) or to protect against resulting dangers.
A3729-2.2 HBM: public
C9C

Advertisement

Table of Contents
loading

Table of Contents