Emergency Shutdown - Watts AERCO Benchmark 2.0 LN Operating & Maintenance Instructions

Benchmark 2.0 gas fired low nox boiler
Hide thumbs Also See for AERCO Benchmark 2.0 LN:
Table of Contents

Advertisement

SAFETY PRECAUTIONS

1.2 EMERGENCY SHUTDOWN

If overheating occurs or the gas supply fails to
shut off, close the manual gas shutoff valve
(Figure 1-1) located external to the unit.
IMPORTANT
The Installer must identify and indicate
the location of the emergency shutdown
manual gas valve to operating personnel.
1.3 PROLONGED SHUTDOWN
After prolonged shutdown, it is recommended
that the startup procedures in Chapter 4 and the
safety device test procedures in Chapter 6 of
this manual be performed, to verify all system-
operating parameters. If there is an emergency,
turn off the electrical power supply to the
AERCO boiler and close the manual gas valve
located upstream the unit. The installer must
identify the emergency shut-off device.
1-2
MANUAL GAS SHUTOFF VALVE
VALVE OPEN
Figure 1-1
Manual Gas Shutoff Valve
VALVE CLOSED