After battery power cable and communication cable connection, users need to enter Advanced setting and
choose Battery type and brand on the inverter LCD
Grid type
230V
Gird Freq
Basic
Grid regulation
Reconnect time(S)
3: SouthAfrica
Charge
HV1
V
S
HV2
V
Discharge
V
V
LV1
S
LV2
HF1
Hz
S
HF2
Hz
Advanced
LF1
Hz
S
LF2
Hz
Debug
Battery type
1:Lead-acid
Device info.
Lithium brand
6:Lux
BAT capacity(Ah)
Charge first(PV)
Basic
Time 1
Charge first power(kW)
:
:
Charge
Time 2
Stop charge first SOC(%)
:
:
Time 3
Stop charge first Volt(V)
Discharge
:
:
Lead-acid
Advanced
Absorb voltage(V)
Float voltage(V)
Start derate Volt(V)
Debug
Device info.
3.6 Grid&EPS load Connection
3.6.1 Grid regulation selection
The inverter has passed the main grid-connection regulations NRS097:
Grid type
Basic
Grid regulation
Charge
V
HV1
Discharge
LV1
V
HF1
Hz
Advanced
LF1
Hz
Debug
Battery type
Device info.
Lithium brand
11
Set
50
For Li-ion battery
1. Please make sure the lithium-ion
V
S
S
HV3
battery to be used is compatible with
V
S
S
LV3
Luxpower inverters. Please contact
S
S
HF3
Hz
your distributor for updated battery
S
S
LF3
Hz
compatible list.
Set
2. If you are using multiple battery
modules with the inverter, the inverter
communication cable must be
connected to the master battery.
Please check with your battery supplier
for battery master and slave settings.
Set
For Lead-acid battery
1. The temperature sensor for lead-acid
battery is optional. If you need it, please
contact distributor for purchasing.
Set
2. There are three stages for lead-acid
battery charging. For charging/discharge
related parameters, please check charge
/discharge setting page.
Gird Freq
50
Set
230V
3: SouthAfrica
Reconnect time(S)
S
V
S
V
S
HV2
HV3
V
S
LV2
V
S
LV3
S
S
S
Hz
S
HF2
Hz
HF3
S
LF2
S
LF3
Hz
S
Hz
Set
1:Lead-acid
6:Lux
BAT capacity(Ah)
3.6.2 Grid and EPS load connection
The inverter can be connected to the load side of the service disconnecting means if the busbar rating in the main
panel can meet the NEC705.12(B)(3) requirements. Otherwise, a Line side connection can be made to avoid an
expensive main panel upgrade.
Grid and EPS Load Connection
EPS
GRID
GEN
L
N
L
N
L
N
PE
L
N
PE
Generator
Backup Panel
Disconnect
Utility Meter
CT
Kw. h
7 9 8 6 6
480r/kw. h 10A
CT
L
Inverter Disconnect
Main Panel
PE
Generator
N
L
N
PE
12

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the LXP8K SPEC and is the answer not in the manual?

This manual is also suitable for:

Lxp10k spec

Table of Contents