Mounting Sokar In A Wall With Sokar-Inw - L-Acoustics Sokar Owner's Manual

Table of Contents

Advertisement

Rigging procedures

Mounting Sokar in a wall with Sokar-inW

type of deployment
rigging accessories
additional material
tools
min. number of operators
Use reinforcements on the drywall for supporting the enclosure assembly.
As reinforcement, use either a second layer of drywall, or wooden battens or panels.
The total thickness of the drywall and its reinforcement should not be more than 30 mm / 1.2 in.
Secondary safety for in-wall congurations
Use the provided tether to implement a secondary safety.
120 mm / 4.7 in of room are required between the main wall and the secondary wall to install the enclosure
assembly.
min. 120 mm / 4.7 in
26
wall-mounting
Soka inWall, including:
• Sokar enclosure
• Sokar-inW rigging accessory
• Soka-Screen
• cardboard cutting template
4 M6x25 Torx screws (provided)
1 M4x12 Torx screws (provided)
secondary safety tether (provided)
torque screwdriver
T30 Torx bit
T20 Torx bit
4 mm hex bit
1
Sokar owner's manual (EN) version 1.0

Advertisement

Table of Contents
loading

Table of Contents