3 3 3 3 SYSTEM
SYSTEM SET
SET- - - - UP
SYSTEM
SYSTEM
SET
SET
Dismantling an array
Apply the associated set-up procedure in reversed order.
3.1
Ground-stacking
3.2
Pole-mounting
ARCSWIFO_RM_EN_1-0
UP
UP
UP
Horizontal
Place the enclosures side-by-side with rails aligned
Remove top WIFORIG bars from their storage location
Slide and lock coupling bars into all top adjacent rails
Refer to PROCEDURE A
Horizontal stacked on SB18m
Place two SB18m side-by-side or on top of each other, logo down
Place the ARCS
side-by-side with rails aligned
Remove top WIFORIG bars from their storage location
Slide and lock WIFORIG bars into all top adjacent rails of
®
ARCS
WIDE/FOCUS
subwoofers in case of an SB18m vertical stack
Refer to PROCEDURE A
Vertical stacked on SB18m
Place and attach the enclosures one after the other, on top of each other, logo down
Refer to PROCEDURE A
On feet or on top of SB18m
Install a WIFOSOCK on an ARCS
Refer to PROCEDURE C
Insert the pole into the WIFOSOCK socket
If needed, insert the other extremity of the pole into an SB18m socket
Tip the assembly to a vertical position
w w w . l - a c o u s t i c s . c o m
®
WIDE/FOCUS enclosures on top of the subwoofers,
enclosures,
and
SB18MRIG
®
WIDE/FOCUS enclosure
bars
between
7 7 7 7