Transporting
Mounting L2-CHARIOTLID/L2D-CHARIOTLID on L2/L2D
Type of deployment
Rigging accessories
Min number of operators
Prerequisite
Each L2/L2D is secured to its chariot.
Procedure
1. Pull out the rigging arms:
a) Pull on the latches while rotating the front rigging arms of the enclosure.
Release the latches to lock the rigging arms in their upward positions.
L2 owner's manual (EN) version 2.0
transporting
L2-CHARIOT/L2D-CHARIOT
L2-CHARIOTLID/L2D-CHARIOTLID
L2-CHARIOTCOV/L2D-CHARIOTCOV
2
See
Securing L2/L2D on L2-CHARIOT/L2D-CHARIOT
SHLAK!
Rigging procedures
(p.51).
81