Download Print this page

Brother BAS-342G Basic Operation Manual page 23

Hide thumbs Also See for BAS-342G:

Advertisement

4-15. Securing the cords and air tubes [10]
<Seen from underneath table>
Leg
Control box
Table
Operation panel
Solenoid valve
assembly
BAS-342G
Secure the air tubes (a), the solenoid
valve
assembly
operation
panel
underneath the table with the three cord
holders (1).
(1) Cord holders [3 pcs.]
(2) Wood screws [3 pcs.]
3981M
<
Checking the cords
1. Gently tilt back the machine head.
(
Refer to "4-5. Tilting back and
returning the machine head".
2. Check that none of the cords are
being pulled.
3. Return the machine head to its
original position.
4. Close the cord presser plate (3) in the
direction of the arrow, and secure it by
tightening the two screws (4).
NOTE:
Close the cord presser plate (3)
securely so that no foreign objects,
insects or small animals can get
inside the control box.
5. Secure the cover of the control box by
tightening the eight screws (5).
Check that the cords are not clamped
by the cover at this time.
3982M
4. INSTALLATION
cord
(b)
and
the
cord
(c)
together
>
)
15

Advertisement

loading