Download Print this page

Brother BAS-342G Basic Operation Manual page 16

Hide thumbs Also See for BAS-342G:

Advertisement

4. INSTALLATION
4-6. Installing the gas spring
Crane or hoist
2586B
1. Tilt back the machine head, and then secure the support lever (1) at stopper position (a).
(
Refer to "4-5. Tilting back and returning the machine head".
NOTE: Use equipment such as a crane or hoist to tilt back the machine head.
2. Tighten the two set screws (2) to secure the support lever shaft (3).
Be sure to install so that
the side with "UP" on it is
facing upward.
8
)
Note that the L and R
shapes are different.
BAS-342G
Engaging
Disengaging
the stopper
the stopper
3. Install the gas spring (8).
(4) Gas spring holders [L and R]
(5) Spacer
(6) Bolt
(7) Nut
(8) Gas spring
(9) Shaft collars [2 pcs.]
(10) Gas spring shaft D
(11) Plain washers [2 pcs.]
(12) Retaining rings E [2 pcs.]
(13) Bolts [4 pcs.]
(14) Plain washers [4 pcs.]
(15) Spring washers [4 pcs.]
(16) Nuts [4 pcs.]
(17) Gas spring shaft U
(18) Set screw
*
After installing the gas spring (8), gently
return the machine head to its original
position.
(
Refer to "4-5. Tilting back and
returning the machine head".
2915B
)

Advertisement

loading