Download Print this page

Brother BAS-342G Basic Operation Manual page 20

Hide thumbs Also See for BAS-342G:

Advertisement

4. INSTALLATION
4-13. Connecting the cords [8]
<Main P.C. board>
NOTE:
• Check that the connector is facing the
correct way, and then insert it firmly
until it locks into place.
• Secure the cables with cable ties and
cord clamps, while being careful not to
pull on the connector.
* Be sure to make the ground connection.
(Refer to "4-14. Connecting the ground
wire".)
X pulse motor encoder 5-pin white
Y pulse motor encoder 5-pin blue
Intermittent presser foot pulse motor encoder 5-pin black
Foot switch 10-pin
Operation panel 8-pin
Safety switch 3-pin
Home position sensor assembly 12-pin
STOP switch 6-pin
Valve harness 12-pin
Programmer relay harness 8-pin
Fan 6-pin
Solenoid selection harness 4-pin
2567B
12
Connector
BAS-342G
1. Remove the cover of the control box.
2. Loosen the two screws (1), and then
open the cord presser plate (2) in the
direction of the arrow.
3. Pass the bundle of cords from the
machine head through the hole in the
table, and then pass it through the
hole in the control box together with
the following cords.
• Tow-pedal foot switch (3)
• Operation panel (Do not pass the
ground wires through the hole.)
• Solenoid valve assembly
4. Securely connect the connectors as
indicated in the table below.
3977M
Connection location on
main P.C. board
P20 (X-ENC)
P4 (Y-ENC)
P5 (P-ENC)
P6 (FOOT)
P1 (PANEL)
P9 (HEAD-SW)
P8 (SENSOR1)
P13 (HEAD)
P12 (AIR1)
P7 (PRG)
P10 (SENSOR2)
P3 (CUTTER)
(Continued on next page)
Lock the cord
clamp securely.
Cord clamp
(3)
(3)
(3)
(3)
(3)
(4)
(4)
(4)
(4)
(3)
(4)

Advertisement

loading