Putting Fresh Water, Sea Water And Waste Water Systems On Line P - Fountaine Pajot ATHENA 38 Operator's Manual

Table of Contents

Advertisement

F. PUTTING FRESH WATER, SEA WATER, AND
WASTE WATER SYSTEMS ON LINE
I. Putting the fresh water system on line
1. Operating principle
Open the inlet valve located forward of the mast bulkhead, accessible
via the wardrobes (see plan No. ATH.PB.01).
Open the inlet valve of the hot water tank in the aft port cabin under
the bunk (see plan No. ATH.PB.01).
Enable the fresh water pump function on the 12 V electric panel
(chart table).
II. Putting the sea water system on stream
1. Operating principle
Open the inlet valve located in the starboard bathroom cabinet.
Enable the annexe function on the 12 V electrical panel (chart table)
to which the pump is connected.
2. Upkeep
Close the valves when the fresh water and sea water systems are not
in use (night-time, afternoon, etc.).
ATHENA OPERATOR'S MANUAL
CREATION
p18/24

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Athena 46

Table of Contents