1MRK506371-UUS Rev. M
ANSI07000108 V2 EN-US
Figure 49:
where:
1
2
2.
Apply 1.2 · Vn (rated voltage) to the V1 and V2 inputs.
3.
Decrease slowly the voltage of in phase VA of the test set until the ALARM signal is activated.
4.
Check the alarm operation level by comparing the differential voltage level at ALARM with the set
alarm level VDAlarm.
5.
Continue to slowly decrease the voltage until PICKUP signal is activated.
6.
Check the differential voltage operation level by comparing the differential voltage level at PICKUP
with the set trip level VDTrip.
7.
Repeat steps
Observe that the connections to V1 must be shifted to test another phase. (VA to VB, VB to VC, VC
to VA)
11.6.5.4
Check of trip and trip reset timers
Procedure
1.
Connect voltages to the IED according to valid connection diagram and figure 49.
2.
Set Vn (rated voltage) to the V1 inputs and increase V2 voltage until the differential voltage is 1.5 ·
operating level (VDTrip).
3.
Switch on the test set. Measure the time from activation of the PICKUP signal until TRIP signal is
activated.
Line distance protection REL670
Commissioning manual
VA
VB
VC
VN
Connection of the test set to the IED for test of alarm levels, trip levels and trip
timer
is three-phase voltage group1 (V1)
is three-phase voltage group2 (V2)
The ALARM signal is delayed with timer tAlarm
1
to
6
to check the other phases.
© 2017 - 2023 Hitachi Energy. All rights reserved
Testing functionality by secondary injection
VA
VB
1
VC
VN
VA
2
VB
VC
ANSI07000108-1-en.vsd
Section 11
SEMOD175258-124 v2
187