No.
Exchange parts name
6
Side board
7
Upper board
8
Bottom board
Work procedure
1. Side board (Right)
1) Perform the step 1-1-1), 2), 3).
2) Remove the fixed screws of the side board (Right).
(ST1T Ø4 × 10, 5 screws)
3) Remove the fixed screws of the side board (Right)
and the manometer fixing board. (ST1T Ø4 × 10, 2
screws)
2. Side board (Left)
1) Remove the fixed screws of the side board (Left).
(ST1T Ø4 × 10, 5 screws)
1) Perform the step 1-1-1), 2), 3) and step 6.
2) Remove the fixed screws of the upper board.
(ST1T Ø4 × 10, 4 screws)
1) Perform the step 1-1-1), 2), 3) and step 6.
2) Remove the fixed screws of the bottom board.
(ST1T Ø4 × 10, 4 screws)
Removal is required if water and refrigerant piping
are connected.
184
Remarks
Side board (Right)
Side board (Left)
Upper board
Upper
Upper
Bottom board
Bottom board
Bottom board