Static Pressure Transducer Installation; (Vav Units Only); Transducer Location; Installing The Transducer - Trane Technologies IntelliPak Signature SCWF Installation, Operation And Maintenance Manual

Commercial self-contained
Table of Contents

Advertisement

Table 20. Fan motor electrical data (continued)
HP
TYPE
ODP
50
TEFC
60
ODP
Table 21. VFD electrical data
Without Bypass
HP
200V
460V
7.5
23.8
10.6
10
32.2
14
15
48.3
21
20
61.9
27.6
25
78.2
34
30
92
41
40
117
53
50
NA
64
60
NA
77
Note: Values are at the maximum VFD input rating and not the reduced
motor values. L.I.C. = Line Input Current.
Table 22. Single stage electric heat electrical data
SXWF Size
Heat Kw
20
18
22
18
25
18
29
23
32
23
35
27
38
27
42
31.5
46
31.5
52
39
58
39
65
48
72
48
80
48
Note: Electric heat amperage should not be considered when
determining minimum circuit ampacity. The current of the unit in
the heating mode will not exceed the current of the unit in the
cooling mode
SCXF-SVX01T-EN
200V
FLA
LRA
N/A
N/A
N/A
N/A
N/A
N/A
VFD L.I.C.
With Bypass
575V
200V
460V
575V
8.8
32.2
10.6
11.1
48.3
14
16.6
61.9
21
21.4
78.2
27.6
26.3
92
34
31.2
117
41
39.9
139.2
53
50.6
n/a
64
NA
n/a
77
200V Amps
460V Amps
50
21.7
50
21.7
50
21.7
63.8
27.7
63.8
27.7
75
32.5
75
32.5
87.4
37.9
87.4
37.9
108.3
46.9
108.3
46.9
133.2
57.7
133.2
57.7
133.2
57.7
460V
FLA
59.0
378.0
59.0
455.0
71.0
464.0
Table 23. 2 stage electric heat electrical data
Unit Size
SCWF
90
100
8.8
110
16.6
16.6
Static Pressure Transducer
21.4
Installation (VAV units only)
26.3
Supply air static pressure controls the inverter option. A
31.2
static pressure head assembly ships separate in control
39.9
panel for field installation in the supply air duct work.
50.6
Installer is responsible for providing pneumatic tubing.
n/a

Transducer Location

Place head assembly in an area of ductwork that will
provide an average and evenly distributed airflow pattern.
Use the following guidelines to determine an appropriate
installation location.
1. Locate static head assembly approximately 2/3 to 3/4
the way down longest duct run, in an area
approximately 10 duct diameters downstream and 2
duct diameters upstream of major interferences, turns,
or changes in duct diameter.
2. When installing pneumatic tubing between head
assembly and transducer in control panel, do not
exceed 250ft for 1/4" OD tubing or 500ft for 3/8" OD
tubing.

Installing the Transducer

Use the following procedure to properly install the static
pressure transducer:
1. Mount pressure sensing head assembly in duct with
sensing tip is in middle of the duct so that it will provide
a proper pressure measurement. See
2. Connect the pneumatic tubing from the sensing head to
the push-on tubing connection in the control panel. Use
a plastic static pickup tubing. Do not exceed 250 feet
for 1/4" OD tubing or 500 feet for 3/8" OD tubing.
Transducer inside control panel picks up low side or
reference pressure.
Installation - Electrical
LRA
FLA
47.0
47.2
N/A
200V
Amps
Heat kW
76
N/A
76
N/A
76
N/A
575V
LRA
305.0
380.0
N/A
460V
575V
Amps
Amps
95.39
N/A
95.39
N/A
95.39
N/A
Figure 24, p.
40.
39

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the IntelliPak Signature SCWF and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Intellipak signature siwf

Table of Contents