Installer's Guide
Energy Recovery Ventilator (ERV)
EERVR100A1P00B
EERVR200A1P00B
EERVR300A1P00B
WARNING:
ALL phases of this installation must comply with NATIONAL, STATE AND LOCAL CODES
IMPORTANT — This Document is customer property and is to remain with this unit. Please return to service information pack
upon completion of work.
A. GENERAL INFORMATION
WARNING
!
THIS INFORMATION IS FOR USE BY INDIVIDUALS
HAVING ADEQUATE BACKGROUNDS OF ELECTRICAL
AND MECHANI CAL EXPERIENCE. ANY ATTEMPT TO
REPAIR A CENTRAL AIR CONDITIONING PRODUCT IN-
CLUDING AN ERV MAY RESULT IN PERSONAL INJURY
AND/OR PROPERTY DAMAGE. THE MANUFACTURER
OR SELLER CANNOT BE RESPONSIBLE FOR THE
INTERPRETATION OF THIS INFORMATION, NOR CAN
IT ASSUME ANY LIABILITY IN CONNECTION WITH ITS
USE.
CAUTION
!
To prevent shortening its service life, the ERV should
not be used during the finishing phases of construc-
tion. Compounds used in construction and construc-
tion dust may cause rapid deterioration of the cabi-
net and internal components. To avoid damage keep
drywall spray, construction dust, etc from entering the
air stream of the unit.
These instructions do not cover all variations in systems
or provide for every possible contingency. Should further
information be desired or particular problems arise which
are not covered sufficiently by this manual, contact your
local distributor or the manufacturer as listed on the ERV
nameplate.
BEFORE YOU BEGIN THE INSTALLATION
Check carefully for any shipping damage. This must be
reported to and claims made against the transportation
company immediately. Open carton, remove packing mate-
rial, loose parts and ship-with literature. Check to be sure
all major components are in the unit. Any missing parts
should be reported to your supplier at once, and replaced
with authorized parts only.
HAZARDOUS VOLTAGE - DISCONNECT POWER BEFORE SERVICING
Contents
General Information
Installation Limitations & Recommendations
Unit Installation
Installation on a concrete wall
Installation on a stud wall
Installation on floor joists
Installation on roof rafters
Duct Connections
Electrical Controls
Percent Timer Control
Push Button Point-of-use Control
Checkout Procedure
Figure 1
18-HE58D1-7
1
1
2
2
3
3
3
6
8
8
9
10
Need help?
Do you have a question about the EERVR100A1P00B and is the answer not in the manual?
Questions and answers