Valve Train Replacement - Napoleon Oakville GDIX4N Installation Manual

Hide thumbs Also See for Oakville GDIX4N:
Table of Contents

Advertisement

Available languages

Available languages

7.9

valve train replacement

A.
Remove the safety barrier and glass door (see "safety barrier and door removal/installation" section).
B.
Remove the burners (see "burner removal" section).
C.
Remove the 14 screws holding the valve train in place (Fig. 6-2).
note:
A new gasket may be required when reinstalling the valve train assembly. Contact your local authorized
dealer / distributor for more information.
D.
Carefully lift the valve train assembly out far enough to access the manual shut off valve and turn to the
off position. Disconnect the fl ex connector from the valve. You may now lift the valve train out of the
appliance.
maintenance
Fig. 6-2
29
W415-2828 / A / 07.13.20
EN

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Oakville seriesOakville gdix4p

Table of Contents