Burner Removal; Valve Train Replacement - Napoleon IR3N-1 Installation And Operating Instructions Manual

Table of Contents

Advertisement

Available languages

Available languages

8.5

BURNER REMOVAL

A.
Remove the glass door, see "DOOR REMOVAL AND INSTALLATION" section.
B.
Remove the logs, see "FINISHING" section.
C.
Remove the 5 screws that secure the log support in place. Lift the support out, refer to Figure 1.
D.
Remove the 4 screws that secure the front burner support in place, refer to Figure 2. Lift the burner up
and out.
FIGURE 1
8.6

VALVE TRAIN REPLACEMENT

A.
Remove the glass door. See "DOOR REMOVAL AND INSTALLATION" section. Remove the burner,
see "BURNER REMOVAL" section.
B.
Remove the 14 screws holding the valve train in place.
NOTE: A new gasket may be required when reinstalling the valve train assembly. Contact your
local authorized dealer/distributor.
C.
Carefully lift the valve train assembly out far enough to access the manual shut off valve and turn to the off
position. Disconnect the fl ex connector from the valve. Ensure all other wires are disconnected for easy
removal of the valve train, lift the valve train out of the appliance.
FIGURE 2
25
EN
W415-1342 / 10.01.14

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ir3p-1

Table of Contents