Valve Train Replacement - Napoleon Oakville Series Installation Manual

Hide thumbs Also See for Oakville Series:
Table of Contents

Advertisement

Available languages

Available languages

maintenance
EN
8.8

valve train replacement

A.
Remove safety barrier and glass door (see "safety barrier & door removal / installation" section).
B.
Remove media tray (see "media tray installation" section) and burners.
C.
Remove porcelain radiant panels (PRPs) or brick panels (if applicable).
D.
Remove the 14 screws holding the valve train in place (Fig. 6-3).
note:
A new gasket may be required when reinstalling the valve train assembly. Contact your local authorized
dealer / distributor for more information.
E.
Carefully lift the valve train assembly out far enough to access the manual shut off valve and turn it to the
off position. Disconnect any wires, and then lift the valve train out of the appliance.
36
W415-1802 / E / 01.20.20
Fig. 6-3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gdi3nGdi3neGdig3nGdix3nGdi3pGdi3pe ... Show all

Table of Contents