13. Wall Control Operating Instructions
Pairing
If you need to re-pair your fan or you want to pair a second wall
control:
1.
Power cycle your fan by turning off the power at the
circuit breaker.
2.
Press and hold
and
for 10-15 seconds.
3.
The LED will blink green then remain solid green.
4.
The green LED along with audible beeps will indicate
that pairing is successful.
5.
Test wall control for functionality.
FIG.27
Line/Hot
F R- W1 8 1 2 ; FR - W1 8 1 3
buttons on wall control
Line/Hot
or Bare)
Ground (Green
Neutral/White
Neutral/White
(cont.)
Unpairing
NOTE: Unpairing must be completed within 3 minutes of turning
the power on to the fan receiver.
1.
When you re-engage power to the fans you want to unpairing,
press and hold the
2.
The LED will alternate red/green, blink green, and the receiver
will beep to indicate that unpairing is successful.
Multi Location Wiring
1.
Install the wall control using the wiring diagram below.
2.
Individually pair each of the wall controls with the fan receiver
using the pairing instructions in the previous section.
NOTE: Pairing must be completed within 3 minutes of turning the
power on to the fan/receiver.
Fan
or Bare)
Ground (Green
If Applicable
and
buttons for 4 seconds.
Red
Fan
If Applicable
23
Need help?
Do you have a question about the MORPHEUS II and is the answer not in the manual?
Questions and answers