Honeywell 900U02-0100 User And Installation Manual page 92

Process & safety controller
Table of Contents

Advertisement

Step
3
Ensure that AC power to the
rack is disconnected.
Set controller module's
communication ports to
desired settings (page 38).
Carefully place the Controller
Module in the rack,
immediately to the right of
the Power Supply. Fasten it
in place with two captured
screws at top and bottom.
Torque to 0,4-0,5 N.m
(3.5 – 4.4 Lb-In).
ATTENTION:
Do not install the battery at
this time. Installing the
battery(s) before the
controller is configured
can substantially shorten
battery life. Install under
power after the controller
configuration is complete.
(For more information, refer
to Battery
Installation/Replacement,
page 210.)
4
I/O will be installed later.
78
ControlEdge HC900 Process & Safety Controller User and Installation Manual
Procedure
See Page 80.
Comments/References
Revision 10
May 2019

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Controledge hc900900p01-0401900c75-0460

Table of Contents