Honeywell 900U02-0100 User And Installation Manual page 257

Process & safety controller
Table of Contents

Advertisement

16 Point DC Digital Input
Step
4
Connect field wiring.
Note: SDC+ in the wiring figure below refers to power that is disconnected from these screw terminals when
switch SW1 is open (0).
DC Supply
16 Point AC Digital Input
Step
1
ATTENTION: RTP and cables are intended for permanent installation within their own enclosure.
ATTENTION: The RTP combines the two groups of 8 inputs into one group of 16.
Mount RTP cable assembly to ControlEdge HC900 Controller (Figure 109).
Remove appropriate key tabs from terminal board to allow mating with the module. See page 87.
Connect desired cable to 16 point AC DI module at controller. Choose from:
900RTC-H210
900RTC-H225
900RTC-H250
Install 16 point AC DI module label into module connector cover.
Connect shield drain wire to the grounding bars at the base of the ControlEdge HC900 rack. All
field-wiring shields must be grounded as described in the shield grounding section (page 83).
Revision 10
ControlEdge HC900 Process & Safety Controller User and Installation Manual
May 2019
1
2
3
4
5
6
7
8
21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
Remote Terminal High Voltage Cable assembly, 1.0 meters long
Remote Terminal High Voltage Cable assembly, 2.5 meters long
Remote Terminal High Voltage Cable assembly, 5.0 meters long
Action
9 10 11 12 13 14 15 16 17 18 19 20
Install jumper wires
Action
243

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Controledge hc900900p01-0401900c75-0460

Table of Contents