Daikin R32 Sky-Air RZAG-M Service Manual page 84

Table of Contents

Advertisement

ESIE17-08
|
Part 3. Repair
PROCEDURE
Removal
1.
Cut the 2 expansion valve pipes (1).
2.
Remove the expansion valve (2).
C
AUTION
The maximum applied Nitrogen pressure must not exceed 0.02 MPa.
3.
Supply nitrogen to the piping circuit.
4.
Using an oxygen acetylene torch, heat the 2 expansion valve pipes (1).
5.
When the solder material is liquid, pull the 2 expansion valve pipes (1).
6.
Cut the nitrogen supply when the piping has cooled down.
1. Expansion valve pipe
Installation
1.
Wrap a wet rag around the expansion valve Y1E (3).
W
ARNING
Overheating the expansion valve Y1E will damage or destroy it.
2.
Proceed in reverse order.
Page 84
R32 Sky-Air RZAG-M
Figure 3-18: Removing expansion valve
1
3.3. Unit specific repair procedures
2
2. Expansion valve
15/11/18
|
Version 1.1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rzqg71Rzqg100Rzqg125Rzqg140

Table of Contents