9
Reception and Storage
Note
10
Preparation for Installation
Select the optimum installation site in accordance with the generally applicable guidelines or consult the
responsible authorities. The installation of the cooler must be planned by the installer or operator.
Ensure that the cooler is easily accessible so that any maintenance work that may be necessary later can be
carried out without any problems.
11
Mounting the Cooler
The cooler is designed for stationary use and, if properly selected and installed, guarantees long service life and
minimum maintenance.
Shut-off control devices must be provided by the customer in the inlet of the coolant and the sample to be
cooled.
Note
12
Connecting Coolant and sample to be Cooled
Warning
Connect the coolant and the sample to be cooled according to the technical data and the drawings in chapter 8.
14
The cooler must be stored in a weather protected frost-free area!
During transport and storage, the cooler should always be positioned and stored
according to the position indicated on the packaging.
Ensure the tightness of the tube fitting!
Check the tightness of all tubes after they have been connected.
Do not reduce the specified condensate tubing cross-sections. Reduced cross-
sections might impair the condensate drainage (if present).
Incorrect pressure can destroy the cooler.
When connecting, pay attention to the correct pressure specifications
according to the technical data and the type plate!
The device must be grounded and the potential equalization with the system
must be established.
LC, LG, LT | 1.00.01
www.mc-techgroup.com
Need help?
Do you have a question about the LC Series and is the answer not in the manual?