Vaillant flexoTHERM exclusive VWF 117/4 Installation And Maintenance Instructions Manual page 63

Table of Contents

Advertisement

GROUND SOURCE HEAT PUMP COMMISSIONING CHECKLIST
This Commissioning Checklist is to be completed in full by the competent person who commissioned the heat pump and associated
equipment as a means of demonstrating compliance with the appropriate Building Regulations and then handed to the customer to keep for
future reference.
Failure to install and commission this equipment to the manufacturer's instructions may invalidate the warranty but does not affect statutory rights.
Customer name:
Address:
Heat Pump Make and Model
Heat Pump Serial Number
Commissioned by (PRINT NAME):
Company name:
Company address:
CONTROLS - SYSTEM AND HEAT PUMP (tick the appropriate boxes)
Time and temperature control to heating
Time and temperature control to hot water
Hot water zone valves
Thermostatic radiator valves
Automatic bypass to system
Buffer Vessel Fitted
ALL SYSTEMS
What system cleaner was used?
What inhibitor was used?
Are all exposed external pipeworks insulated?
BORE HOLE/GROUND LOOPS
Bore Hole
Ground Loop
Has the system been vented/de-aired?
Is the system topped up to the correct level?
Are isolating valves in their correct position
What system cleaner was used?
What antifreeze was used?
What temperature will the antifreeze protect to?
What inhibitor was used (if not included in Antifreeze)?
CENTRAL HEATING MODE Measure and Record
Heating Flow Temperature
DOMESTIC HOT WATER MODE Measure and Record:
Is the heat pump connected to a hot water cylinder?
Hot water has been checked at all outlets
ADDITIONAL SYSTEM INFORMATON
Additional heat sources connected:
ALL INSTALLATIONS
The heating, hot water and ventilation systems complies with the appropriate Building Regulations
All electrical work complies with the appropriate Regulations
The heat pump and associated products have been installed and commissioned in accordance with the manufacturer's instructions
The operation of the heat pump and system controls have been demonstrated to the customer
The manufacturer's literature, including Benchmark Checklist and Service Record, has been explained and left with the customer
Commissioning Engineer's Signature
Customer's Signature
© Heating and Hotwater Industry Council (HHIC)
0020213394_01 flexoTHERM exclusive Installation and maintenance instructions
Telephone number:
Telephone number:
Commissioning date:
Room thermostat and programmer/timer
Load/weather compensation
Cylinder thermostat and programmer/timer
Yes
No
°C
Unvented
Vented
Yes
Gas Boiler
Electric Heater
Programmable Roomstat
Combined with Heat pump main controls
Fitted
Fitted
Fitted
Built In
Fitted
Fitted
If YES
Volume:
Quantity
Length/Depth
Qty
Qty
Qty
Heating Return Temperature
Thermal Store
Yes
Solar Thermal
www.centralheating.co.uk
Appendix
Not required
Not required
Not required
Provided
Not required
Not required
Litres
Yes
Yes
Yes
Yes
litres
Yes
m
Yes
Yes
Yes
Yes
Yes
Yes
Yes
litres
litres
°C
litres
°C
°C
°C
Not Connected
Not required
Yes
Yes
Yes
Yes
63

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents