Page 1
Installation and operating guide go-e Charger Gemini flex 11/22 kW Mobile Wallbox for Electric Vehicles - IC-CPD valid for article numbers: CH-04-11-01, CH-04-22-01 Installation and Operating Guide go-e Charger Gemini flex V 1.2...
In order to save energy are constantly developing the firm- and thus also to charge in an environ- We wish you lots of fun with your go-e The charging unit was developed ware and adapting the app to the...
The go-e Charger Gemini flex has communication interfaces WiFi Download the data sheet: the go-e Charger if the housing is dama- 802.11b/g/n 2.4GHz and RFID. WiFi is www.go-e.com ged or open. operated on a frequency of 2.4Ghz, channels 1-13 with the frequency band In case of unusual heat development, do 2412-2472Mhz.
Page 5
The go-e Charger Gemini flex 11 kW may using an adapter with domestic plug. If water. only be operated at the following con-...
Required for using the app and for resetting the charger to factory settings 16/32 A CEE red plug (Gemini flex 11/22 kW) Connection to red CEE socket or original go-e adapter Wall bracket Mounting material Housing 5x Dowel 8 x 40 mm Impact-resistant and UV-resistant high-performance plastic 4x Screws for wall bracket 4.5 x 50 mm...
Maximum 2,000 m above sea level suitable for permanent outdoor operation Relative humidity Not more than 95 % (non-condensing) For authorised access by the electricity grid operator to the go-e Charger go-e network operator API for grid-serving power control Impact resistance...
Required tools CEE red 16 A (3-phase) CEE red 32 A (3-phase) With original go-e adapters (not included in the scope of delivery, available as accessories): to CEE red 32 A to CEE red 16 A (three-phase - limitation by charging station to 16 A)
Page 9
8. Installation 8. Installation Drill holes at the four marked positions. The go-e Charger is equipped with an integrated DC protection module with direct current detec- tion and additional AC detection (6 mA DC, 20 mA AC). On the building side, an RCD type A and a circuit breaker must be installed.
LEDs corresponds to the set charging current. Five predefined charging levels can be selected via the but ton. 1 LED = 1 A Gemini flex 11 kW = 6 A - 16 A Gemini flex 22 kW = 6 A - 32 A...
„ground check“, which prevents the char- the „cable release“ function of your vehicle or ging process in TT/TN power grids (common the large round button of the go-e Charger app in most European countries) in case of in- (tab „Charging“).
Page 12
Try to insert it into the yellow statically at the bottom. type 2 socket as far as possible. Check whether the supply line to the go-e Char- ger is properly grounded. Firmware update The LEDs flash pink and turn yellow with increa- Phase error sing progress of the update.
If the charger does not leave this mode, the WiFi Protection against unauthorised charging signal may be disturbed. Please remove possi- If you install the go-e Charger outdoors, you can ble sources of interference (e.g. devices with a protect the device against use by unauthorised WiFi mesh network).
12. App - connection setup 12. App - connection setup Set up connection via WiFi The go-e Charger can also be used without an app. For remote control of the charger and for some comfort functions, a WiFi connection of the Download the go-e Charger app if you want to charger is essential.
Page 15
12. App - charging 12. App - settings The „Charging“ tab of the go-e Charger app gi- ves you direct access to the most important You can adjust the basic and comfort settings of functions for starting, stopping and monitoring the charger via the „Settings“...
In the (justified) case of common at the end of the working day and take the return of the defective product to go-e, go-e will bear the costs incurred. If, in the event of a electricity that could otherwise not be used sen- guarantee claim, it becomes apparent that the device needs to be replaced, the customer waives sibly.
CE Declaration of Conformity: Hereby go-e GmbH declares that the radio equip- Do you still have questions about the go-e Charger? ment type go-e Charger Gemini flex 11 kW and go-e Charger Gemini flex 22 kW is in compliance with Directive 2014/53/EU. The full text of the EU Declaration...
Need help?
Do you have a question about the Gemini flex and is the answer not in the manual?
Questions and answers