Download Print this page

Cisco Firepower Management Center 1000 Getting Started Manual page 22

Advertisement

Connect Cables, Turn On Power, Verify Status for Versions 6.2 - 6.4
Connect Cables, Turn On Power, Verify Status for Versions 6.2 - 6.4
This procedure references the rear panel ports of the FMC 2500 and 4500. The FMC 1000 is the same except
that it does not have the two 10-G SFP+ ports above the Ethernet ports.
AC power supplies have internal grounding so no additional chassis grounding is required when the supported
AC power cords are used. For more information about supported power cords, see the
Management Center 1000, 2500, and 4500 Hardware Installation
After rack-mounting the chassis, follow these steps to connect cables, turn on power, and verify connectivity.
Use the following figure to identify the rear panel ports.
Cisco Firepower Management Center 1000, 2500, and 4500 Getting Started Guide
22
Pre-Configuration
Review Network Deployment for Versions 6.2-6.4, on page 19
Pre-Configuration
Connect Cables, Turn On Power, Verify Status for Versions 6.2 - 6.4, on page
22
Firepower
(Optional) Configure Network Settings Using a Physical Connection for Software
Management Center
Versions 6.2 - 6.4, on page 25
Firepower
FMC Initial Setup Using the Web Interface for Software Versions 6.2 - 6.4, on
Management Center
page 25
Firepower
Configure FMC Administrative Settings, on page 29
Management Center
Firepower
Add Managed Devices to the FMC, on page 38
Management Center
Cisco Firepower Management Center 1000, 2500, and 4500 Getting Started Guide
Guide.
Cisco Firepower

Advertisement

loading