Connect Cables Turn On Power Verify Status for Versions 6.5 and Later
This procedure references the rear panel ports of the FMC 2500 and 4500. The FMC 1000 is the same except
that it does not have the two 10-G SFP+ ports above the Ethernet ports.
AC power supplies have internal grounding so no additional chassis grounding is required when the supported
AC power cords are used. For more information about supported power cords, see the
Management Center 1000, 2500, and 4500 Hardware Installation
After rack-mounting the chassis, follow these steps to connect cables, turn on power, and verify connectivity.
Use the following figure to identify the rear panel ports.
Pre-Configuration
Review Network Deployment for Versions 6.5 and Later, on page 6
Pre-Configuration
Connect Cables Turn On Power Verify Status for Versions 6.5 and Later, on
page 9
Firepower
Use one of the following:
Management Center
Perform Initial Setup at the Web Interface for Versions 6.5 and Later, on
page 12
FMC Initial Setup Using the CLI for Versions 6.5 and Later, on page 15
Firepower
Review Automatic Initial Configuration for Versions 6.5 and Later, on page
Management Center
18
Firepower
Configure FMC Administrative Settings, on page 29
Management Center
Firepower
Add Managed Devices to the FMC, on page 38
Management Center
Cisco Firepower Management Center 1000, 2500, and 4500 Getting Started Guide
Connect Cables Turn On Power Verify Status for Versions 6.5 and Later
Guide.
Cisco Firepower
9

Advertisement

loading