Preparing For Use After Storage - KTM 790 Duke 2019 Owner's Manual

Table of Contents

Advertisement

21.2

Preparing for use after storage

Take the motorcycle off the front lifting gear. (
Remove the rear of the motorcycle from the lifting gear.
(
p. 131)
Charge the 12-V battery.
Install the 12-V battery.
Set the time and date.
Perform checks and maintenance measures when preparing for
use. (
p. 105)
401059-01
Take a test ride.
p. 133)
(
p. 191)
(
p. 189)
STORAGE 21
245

Advertisement

Table of Contents
loading

Table of Contents