Operation; Service - H&S LOADMASTER 2X Operator's Manual

Table of Contents

Advertisement

UNLOADING/DUMPING THE WAGON
1. When dumping into a truck, or other receiving vehicle, choose a level area, free of obstructions.
2. With the operator in the tractor seat, and all others well clear of the 2X, actuate the "LIFT" hydraulic
control valves of the boxes to raise to the desired dumping height.
3. When the desired dumping height has been reached, actuate the "TILT/DUMP" hydraulic control valves
to dump the boxes.
4. After the load is dumped, or the desired amount has been dumped, reverse the control valves to bring
the box back to the upright position.
5. Reverse the control valves for the lift cylinders to return the boxes to the transport position.
6. The entire dumping cycle should take approximately two to three minutes depending on hydraulic
supply output.
CAUTION:
Never move the wagon when the box is raised. This will cause extreme stress on the structural
members and may cause failure.
Following is the color to the fuction of the hydraulic hoses.
(G) Gray - Rear Tank Lift Cylinders
(B) Black - Front Tank Lift Cylinders
(Y) Yellow - Rear Tank Tilt Cylinders
(T) Tan - Front Tank Tilt Cylinders
(R) Red - Hydraulic Jack
TRACKS
Note: Check the track alignment daily or every 10 hours of road operation
for proper track alignment.
Note: Minimum turning radius 1.5 X the overall length of the tractor plus
implement.
See the supplied Track Manufacturers Operator's Manual for service and adjustments.

OPERATION

Y
T
R

SERVICE

-18-
G
B

Advertisement

Table of Contents
loading

This manual is also suitable for:

9230

Table of Contents