A.3.1 Scope of installation work
For details about the scope of installation work, refer to Section 4.1, "Installation Preparations."
A.3.2 Unpacking and device check
Unpack and check this equipment as follows:
• During unpacking, carefully handle this equipment so as not to apply shock to it or damage its
appearance.
• Check this equipment and accompanying package are not damaged.
• Check wiring does not have a short circuit and is not disconnected.
• Check no incorrect screws are contained in the package.
A.3.3 Installation conditions
For the classification of this work, refer to Section 2.1, "Installation Conditions."
The installation method may differ depending on the site where this equipment is installed. In
principle, the installation method conforms to the appropriate method for the site.
Do not install this equipment at the following locations:
• Place exposed to direct sunlight or near a heater.
• Humid or dusty place
• Place where this equipment is exposed to shock or vibration
• Unstable place, such as on a slope or place with a lot of weight on it
• Place where this equipment is subject to strong magnetic and radio waves
A.3.4 Connecting external cables
Refer to Chapter 2, "Installation and Connection," for the connection methods, Section 4.2,
"Cables and Connector Details," and A.2.3, "Function specifications," for device connector pin
assignments.