Positioning and leveling the system
The following tools are required to position and level the system:
socket wrench (anchor bolts)
— 1 1/8 inch for Kit A
— 24 mm for Kit B
5/8" socket wrench (pedestal bolts)
Procedure 68
Leveling the system
1
Loosen the anchor bolts until the mounting plates are free to move.
2
Starting from one end of the line-up, move a column into position.
3
Loosely install the pedestal mounting hardware (1/2" bolts, lock washer,
plain washer, and insulating washer), using the plastic insulating
washers.
4
Re-level the column, adding or removing shims as needed. Go back and
re-level any other columns.
5
Repeat the above steps until all columns have been positioned.
6
Slide shims completely under seismic plates. First tighten the pedestal
mounting bolts, torque to 122 Newton-meters (90 ft-lbs). Then, tighten the
concrete anchors, torque to 48 Newton-meters (35 ft-lbs).
Installing earthquake bracing