Nortel Meridian 1 Succession 1000M Installation And Configuration Manual page 215

Large system
Hide thumbs Also See for Meridian 1 Succession 1000M:
Table of Contents

Advertisement

Refer to Table 37 on
Shelf 0 3PE cards to the Core/Net 0 panel; connect Shelf 1 3PE cards to the
Core/Net 1 panel. The 3PE cables for Network Group 0 are factory installed.
WARNING
The shortest Fiber Cable must always be used.
The cables from Group 0 to Group 1 must always be
the same length as the cables from the last group
back to Group 0
The delta between the lengths of each fiber ring from
Group 0 to any other group must not exceed 50'.
Rings are directional. Ring 0 is ascending and ring 1
is descending.
Procedure 41
Connecting the Network Shelf 0 3PE cards to Core/Net 0
1
Connect a NTND14 cable of the appropriate length from J3 on the 3PE
card faceplate in Network Group 1, Shelf 0 to the Port 9-1, J3 connection
on the 3PE Fanout panel in Core/Net 0.
2
Connect a NTND14 cable of the appropriate length from J4 on the 3PE
card faceplate in Network Group 1, Shelf 0 to the Port 9-1, J4 connection
on the 3PE Fanout panel in Core/Net 0.
3
Connect a NTND14 cable of the appropriate length from J3 on the 3PE
card faceplate in Network Group 2, Shelf 0 to the Port 10-0, J3 connection
on the 3PE Fanout panel in Core/Net 0.
4
Connect a NTND14 cable of the appropriate length from J4 on the 3PE
card faceplate in Network Group 2, Shelf 0 to the Port 10-0, J4 connection
on the 3PE Fanout panel in Core/Net 0.
5
Install the remaining cables according to the assignments in Table 37 on
page 212.
Cabling network modules and loops
page 212
for cCNI port and slot assignments. Connect
End of Procedure
Large System
Page 215 of 376
Installation and Configuration

Advertisement

Table of Contents
loading

Table of Contents