Energy Management - Fronius Primo GEN24 8.0 Plus Operating Instructions Manual

Hide thumbs Also See for Primo GEN24 8.0 Plus:
Table of Contents

Advertisement

Energy management

Energy manage-
"Self-Consumption Optimization"
ment
Set the operating mode to
lates to the set
mode (factory setting), an adjustment is made to 0 W at the feed-in point (max-
imum self-consumption).
The "Target Value at Feed-In Point" also applies if a further source feeds into this
Smart Meter. However, in this case:
-
-
"Target Value at Feed-In Point"
If "Manual" has been selected under Self-Consumption Optimization, the
ating Mode" ("Consumption"
Point"
IMPORTANT!
"Self-Consumption Optimization"
ment".
External producers
If further decentralised producers are installed in the house, and these are incor-
porated into the self-consumption regulation of the Fronius Hybrid inverter, the
setting
must be activated in the menu area
(see chapter
This means that energy can be drawn from the household network and fed into
the battery via the Fronius GEN24 Plus inverter. You can restrict how much
power is consumed by the Fronius GEN24 Plus inverter by specifying the maxim-
um AC power (AC max.). A maximum power consumption of the AC nominal ca-
pacity of the Fronius GEN24 Plus inverter is possible.
"Battery Management"
Using the time-dependent battery control, it is possible to prevent or restrict
charging/discharging of the battery and to specify a defined charging power.
Battery management is influenced by the following settings, for example:
-
-
-
-
IMPORTANT!
The defined rules for battery control have the second lowest priority after Self-
Consumption Optimization. Depending on the configuration, the rules may not
be satisfied due to other settings.
"Manual"
"Target Value at Feed-In
The Fronius Smart Meter must be installed and configured at the feed-in
point.
The
"Allow battery charging from additional producers in home network"
function must be activated in the
can be set.
(only possible with active battery)
"Allow battery charging from additional producers in home network"
Components
on page 106.
Permitted battery charging from the public grid
Power limitation of the inverter, energy storage device or overall system
Control specifications via Modbus
Self-consumption optimization
or "Automatic". The inverter always regu-
Point". In the
"Components"
/
"Feed-In")
and the
"Target Value at Feed-In
has lower priority than
"Device Configuration"
"Automatic"
operating
"Battery"
menu area.
"Oper-
"Battery Manage-
"Components"
111

Advertisement

Table of Contents
loading

This manual is also suitable for:

Primo gen24 10.0 plus

Table of Contents