All-Pin Separation Cabling Variant E.g. Germany, France, Spain, Uk; Functions; Transitioning From Feeding Energy Into The Grid To Backup Power Mode - Fronius Primo GEN24 8.0 Plus Operating Instructions Manual

Hide thumbs Also See for Primo GEN24 8.0 Plus:
Table of Contents

Advertisement

All-pin separation cabling variant e.g. Germany,
France, Spain, UK

Functions

-
-
-
-
-
Transitioning
1.
from feeding en-
ergy into the grid
2.
to backup power
3.
mode
4.
5.
6.
7.
8.
9.
48
Measuring and transferring the required parameters for energy management
and Solar.web by the Fronius Smart Meter.
Disconnecting from the public grid to enable operation in backup power
mode if the grid parameters are outside the country-specific standards.
Reconnecting to the public grid when the grid parameters are within the lim-
its specified by the country-specific standards.
Establishing a proper ground connection for backup power mode to ensure
the protection devices function correctly.
Option of having a separate backup power circuit or several backup power
circuits that are supplied even during failure of the public grid. The total load
of the backup power circuits must not exceed the nominal output of the in-
verter. Furthermore, the performance of the connected battery must also be
considered.
The public grid is monitored by the inverter's internal grid and system pro-
tection unit and by the Fronius Smart Meter connected to it.
Failure of the public grid.
The inverter carries out the necessary measures according to the country
standard and then switches off.
Contactors K1, K2 (K2 - optional in France and Spain), K4 and K5 drop out.
This disconnects the backup power circuits and the inverter from the rest of
the home network and from the public grid, as the main contacts of the con-
tactors K1 and K2 all-pin open. The NC auxiliary contacts of contactors K1
and K2 send feedback to the inverter that the contactors are open (a condi-
tion for starting backup power mode).
The NC main contacts of contactors K4 and K5 are closed, establishing a
connection between the neutral conductor and the ground conductor. The
two other NC main contacts of contactors K4 and K5 give feedback to the
inverter that the ground connection has been established correctly (a condi-
tion for starting backup power mode).
The inverter activates relay K3, which interrupts the supply to contactors K1,
K2, K4 and K5. This prevents unintentional activation of contactors K1, K2,
K4 and K5 and thus a grid connection when voltage is restored in the grid.
The NO contact of relay K3 gives additional feedback to the inverter on
whether the locking was successfully performed by relay K3.
The inverter decides based on the contactors' feedback as well as the meas-
urements on the inverter terminals and the Smart Meter that backup power
mode can be started.
After all the required activation tests have been carried out, the inverter
starts backup power mode.
All loads in the backup power circuits are supplied with power. The remaining
loads are not supplied with power and are safely isolated.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Primo gen24 10.0 plus

Table of Contents