Install The Erp-Ft-Dali Option Card - ETC Echo Relay Panel Feedthrough Installation Manual

Table of Contents

Advertisement

Install the ERP-FT-DALI Option Card

Images in this section show a 24-channel panel
(ERP24-FT).
1. Turn off power to the relay panel.
2. Remove the four screws securing the front panel
to the ERP-FT.
3. Fold down the User Interface panel, taking care
to leave all wire harnesses connected. This panel
has two tabs that, when inserted, provide
additional support for the fold-down panel.
4. Align the option card to the mounting studs
located to the right of the User Interface.
5. Use the four screws provided to secure the
option card to the mounting studs.
32
Relay Panel Feedthrough Installation Manual
User
Interface
Insert
tabs

Advertisement

Table of Contents
loading

This manual is also suitable for:

Erp24-ftErp24-ft121pErp24-ft241pErp48-ftErp48-ft481pErp48-ft482p ... Show all

Table of Contents