STARTUP REPORT
Checklist Item
Does electrical service correspond to unit nameplate?
- Nameplate supply voltage/phase: Rated
- Nameplate rated FLA motor current: Rated
Does all field wiring conform to unit wiring diagram?
Is field - provided freeze protection present (if required)?
Is fan wheel turning in the correct direction?
Is the filter clean?
Is the unit properly supported?
Is unit installed level (necessary for proper condensate drainage)?
Is properly sized condensate trap present?
Is the condensate disposal system operating correctly?
Is the DX system charged per the condensing unit instructions?
Is unit piping correct and insulated to prevent condensation?
Are the refrigerant pipe lines properly insulated?
Are there any leaks detected: interior to unit or at connections?