Carrier 40QQ-036ABA3-0A0 Installation Instructions Manual page 37

Vrf rooftop heat recovery and heat pump
Table of Contents

Advertisement

10. Route the power wire through the rubber grommet on
the bottom of the control box. Then bundle and tie the
extra wire as shown in Fig. 58.
Fig. 58 - Route Wire Through Bottom of Control Box
11. For 460V rooftop units, use the two L1 and L2
adapter harnesses included with the rooftop unit
(located in the bag in the control box) to connect to
the secondary side of the 460V to 208/230V
transformer (TRAN2). See Figs. 59 and 60.
For 460V 40QQ units; Connect power
and ground here using adapter harnesses
and ground wire.
Fig. 59 - FS Box Power and Ground Connections for
460V 40QQ Units
Fig. 60 - L1 and L2 Adapter for 460V Units
12. For 208/230V rooftop units, connect directly to the
Main power terminal block (TB1) in the rooftop
control box shown. See Fig. 61.
For 208/230V units; Connect
power and ground here
Fig. 61 - FS Box Power and Ground Connections for
208/230V 40QQ Units
13. Replace all panels and seal the three holes for the
field installed line sets using insulation.
37