Lenovo 7X18 Maintenance Manual page 99

Hide thumbs Also See for 7X18:
Table of Contents

Advertisement

To install the operator panel tray assembly, complete the following steps:
Step 1.
Align the operator panel tray assembly with the slot in the front of the server, and insert the tray
assembly until it clicks into place.
Figure 84. Operator panel tray assembly installation
Step 2.
Install the tray assembly to the server with a screw.
Step 3.
Connect the front operator panel cable and USB cables to the system board.
Figure 85. USB 2.0 cable and front operator panel cable
Table 43. USB 2.0 cable and front operator panel cable
USB 2.0 cable
1
Note: Make sure the USB 3.0 connector stays vertical when being pushed into the connector on
the system board.
Front operator panel cable
2
.
Chapter 3
Hardware replacement procedures
91

Advertisement

Table of Contents
loading

This manual is also suitable for:

Thinksystem sr8507x19

Table of Contents