• Once the phase of mechanical installation of the METER is finished,
it is necessary to configure the METER in order to make it compatible
with the inverter. Set the parameters on the meter display as set out in
the table:
Parameter
Address
Protocol
Baud rate
Parity
The settings are made by using the keypad and the display on the meter:
1. Press for two seconds
2. Press repeatedly
until the display shows "Set".
- Press
to confirm.
3. Press repeatedly
until the display shows "RS-485".
- Press
to confirm.
4. Press repeatedly
until the display shows "Prot".
- Press
to access.
- Press
to enable the change in the value.
- Press repeatedly
until the display shows "Modbus".
- Press
to confirm the change.
- Press for two seconds
5. Press repeatedly
until the display shows "Baud".
- Press
to access.
- Press
to enable the change in the value.
- Press repeatedly
and select 19200.
- Press
to confirm the change.
- Press for two seconds
6. Press repeatedly
until the display shows "Address".
- Press
to access.
- Press
to enable the change in the value.
- Press repeatedly
and select 1.
- Press
to confirm the change.
- Press for two seconds
7. Press repeatedly
until the display shows "Parity".
- Press
to access.
- Press
to enable the change in the value.
- Press repeatedly
and select even.
- Press
to confirm the change.
- 92 -
Settings
MODBUS
19200
EVEN
to access the setup menu of the meter.
to return to the RS485 menu.
to return to the RS485 menu.
to return to the RS485 menu.
5 - Installation