Input voltage
Message on display
Vin < Vstart
Waiting Sun
Vin > Vstart
Missing Grid
The inverter is powered SOLELY by the voltage generated by the photovoltaic generator: the
presence of grid voltage alone is NOT SUFFICIENT for the inverter to switch on.
To address any problems that may occur during the initial stages of operation of the system
and to ensure the inverter remains fully functional, you are advised to check for any firmware
updates in the download area of the website www.abb.com/solarinverters or at https://regi-
stration.abbsolarinverters.com (instructions for registering on the website and updating the
firmware are given in this manual).
A notification will confirm that the wizard is completed.
• After the wizard is completed, the message "Initializing...Please Wait" is
displayed on the inverter display. Regardless of the input voltage value,
the inverter displays various messages and changes the behaviour of the
"Power" and "Alarm" LEDs
LED Status
Description
Power = Flashing
The input voltage is not sufficient to enable connection
Alarm = OFF
to the grid.
The input voltage is sufficient to enable connection to the
Power = Flashing
grid: the inverter waits for the grid voltage to be present
Alarm = ON
to make the parallel connection.
• With the inverter in the "Missing Grid" status, close the AC switch down-
stream of the inverter thus applying the grid voltage to the inverter: the
inverter checks the grid voltage, measures the insulation resistance of
the photovoltaic field with respect to ground and performs other auto-dia-
gnostic checks. During the preliminary checks on the parallel connection
with the grid, the "Power" LED keeps flashing, the "Alarm" and "GFI"
LEDs are off.
• During the check on the grid voltage and the measurement of the in-
sulation resistance, the voltage, grid frequency and insulation resistance
values measured by the inverter are displayed. The inverter ONLY cre-
ates a parallel connection with the grid if the grid and insulation resist-
ance parameters fall within the ranges foreseen by current regulations.
• If the outcome of the preliminary checks on the grid parallel is positive,
the inverter connects to the grid and starts to export power to the grid. The
"Power" LED remains fixed on while the "Alarm" and "GFI" LEDs are off.