Rinnai Pro Series Installation Manual page 14

Ducted central heating & cooling systems
Hide thumbs Also See for Pro Series:
Table of Contents

Advertisement

Drain pipe installations using a pump
7-9 kW models
Ceiling
When connecting multiple drain pipes, install the pipes as illustrated below. If the condensate pump
drain outlet is not used and one of the gravity drain outlets is used, fit the plug (from the gravity
outlet) into the pump outlet and unplug the pump from the indoor PCB terminal CN13.
Pass the drain hose through the wall. Make sure the water drains to a safe location where it will not
cause water damage or a slipping hazard.
Units with a pump
0-55 cm
(21.7 ")
1. Remove the test cover, then fill the water pan with two litres of water.
2. During commissioning or performing a test run, turn on the unit in COOLING mode, you will
hear the drain pump start. Check whether the water is discharging properly, a one minute lag
is possible, depending on the length of the drain pipe. Check for water leaks from all joints. To
force the system into COOLING mode refer 'Forced Cooling' on p.29.
3. Turn off the air conditioner and put the cap back on.
7 - 9 kW models
Test cap
14 |
1-1.5m
<20cm
Fall
1/50
11 - 18 kW models
Test cap
Stow tube
Stow tube
11-18 kW models
Ceiling
Units without a pump
≥10 cm
(4 ")
1-1.5m
<20cm
Fall
1/50

Advertisement

Table of Contents
loading

Table of Contents